+45 70 23 10 20 info@inblue.com

CONTACT FORM

Consent

PROJECT
description

The renovation of the East Kilbride Swimming pool took place in 2017 with the implementation of the inBlue solution to provide a new water treatment system for the facility. As a result the quality of the water and the swimming environment improved allowing the bathers to enjoy their stay without experiencing the negative symptoms caused by chlorine by-products.

The pool area includes

  • A 50 m long Olympic sized swimming pool with depth of 1,2 – 3,8 m
    and with a small water slide at the shallowest end of the pool.
  • A 12 x 5,6 m warm water pool with depth of 1,2 – 1,4 m
    mainly used for physiotherapy and baby swimming, also including a hot tub.

East Kilbride Swimming Pool

Year 2017
Type Olympic Sized Swimming Pool
Country Denmark