+45 70 23 10 20 info@inblue.com

CONTACT FORM

Consent

PROJECT
description

Harjagersbadet in Kävlinge was built in collaboration with PEAB AB and has been in operation since September 2023. The gross area of the swimming facility is 7100 m2.

The pool area includes

  • A 25 x 25 m swimming pool with a jumping tower
  • 2 multi-pools with moveable floors
  • Children´s area with waterslide

Harjager Swimming Pool – Kävlinge

Year 2021-2023
Type Large Scale Pool
Country Sweden